Subchapter 10.3 – En-Route Operations and Frequency Changes

PHASE 6: DEPARTURE AND INITIAL CLIMB

Timeline: T+0:03 (3 minutes after takeoff)
You are climbing through 800 feet. Tower will now instruct you to contact Salzburg Departure.

Frequency Change to Departure

Salzburg Tower · OE-DMS

TOWER: OE-DMS, climb to flight level zero-eight-zero, contact Salzburg Departure on one-nineteen decimal four-five-zero.
PILOT: Climb to flight level zero-eight-zero, one-nineteen decimal four-five-zero, OE-DMS.
Analysis: Tower issued a climb clearance (confirming the original clearance) and a frequency change. You read back the altitude and the new frequency. Now you will change frequency to 119.450.